Dropped Insulator
On August 8, at 10:45 am, a Wire Crew was working from a bucket truck to remove a 230kV insulator from a lattice dead-end structure. As the crew began to lower the
Read More...On August 8, at 10:45 am, a Wire Crew was working from a bucket truck to remove a 230kV insulator from a lattice dead-end structure. As the crew began to lower the
Read More...